Saving carbon on the beach
26 October 2026

The Environment Agency recently put electrically powered construction machines through their paces on a Sussex beach to show that green technology can stand up to the demands of vital coastal defence work while cutting air and noise pollution.
From 12 to 16 October, an electric fleet successfully shifted shingle from White Point in Eastbourne to North-east Beach at Sovereign Harbour, East Sussex. The equipment, which included a 22-tonne excavator, tipper trucks, hybrid bulldozers and 4x4 vehicles, carried out the work as part of annual efforts to protect the coast from flooding and erosion.
The agency says that ‘Electric October’ trial showed that battery-powered machinery can cope with the tough demands of a working beach, while cutting emissions and fuel costs.
Throughout the week, the project team gathered data on productivity, reliability, battery performance, energy consumption, charging requirements and operator experience, and concluded that electric machinery was up to the job, with the added benefit of significantly reducing air and noise pollution.
The results will now help shape future decisions on rolling out lower-emission equipment in beach management, coastal construction, and flood and coastal erosion risk management projects across the country.
Amber Carr, Pevensey Bay to Eastbourne Beach Manager, said: “Electric October has shown us that this technology is not just a nice idea, it can work in a real operational environment. Watching a fully electric excavator and fleet of vehicles keep pace with our teams on the beach has been genuinely exciting, and it’s given us real confidence about how we can run these essential operations more sustainably in future.”
Nick Gray, Area Flood and Coastal Risk Manager, added: “Keeping shingle moving along this stretch of coast is essential to protecting homes, businesses and infrastructure from flooding and erosion. This trial has shown that low-carbon technology can do that job just as effectively as traditional machinery, giving us a clear and practical route towards cleaner coastal defence in the future.”
Electric October was a joint innovation project between the Environment Agency and industry partners, testing low-carbon machinery on live coastal defence works.
The Pevensey to Eastbourne Coastal Management Scheme covers nine miles of coastline in south-east England and will cost around £140m over the next ten years. The Environment Agency currently manages the six-mile Pevensey stretch. From June 2027, it will also take over management of the Eastbourne Frontage from Eastbourne Borough Council.
● Subscribe free to the blog here to make sure you receive my regular news update emails for tool hire and plant hire professionals
