Prolectric urges joined-up action
23 June 2026

Prolectric believes that the Construction Plant-hire Association’s (CPA) recent Conference in London reflected the urgent need for joined-up action across policy, investment, skills and technology to support a more productive construction sector, while accelerating the transition away from diesel-dependent site operations.
The off-grid power and lighting specialist said the event, held under the theme of ‘Unlocking the Nation’s Growth Plans’ at One Great George Street in Westminster, represented a timely opportunity for the sector to confront the barriers holding back UK construction by identifying practical ways to help Britain build more efficiently, sustainably and resiliently.
The event brought together almost 150 delegates from across the plant-hire, construction, supply chain, communications and political communities.
Prolectric particularly welcomed the conference’s final session, ‘Decarbonisation and Preparing for the Future’, led by Luis Bassett, CPA’s Decarbonisation and Sustainability Manager. As a timely and practical discussion on the industry’s route to lower-carbon operations, he warned that climate change remains a very real threat, noting that an average global temperature increase of 1.5C took 40 generations in the past, yet at current rates could be reached in just three, with consequences including flooding, reduced crop growth and damage to infrastructure.
John Foster, Prolectric’s Managing Director, commented: “Prolectric supports the CPA’s pragmatic approach, recognising that while Net Zero cannot be achieved overnight, measured, staged reductions are essential to help construction businesses transition away from fossil fuels and towards cleaner, more resilient site power solutions.
“At a time of fuel price volatility, growing pressure on project costs and increasing expectations around emissions reduction, solar and hybrid technologies offer a practical way to strengthen business continuity, improve cost control and reduce exposure to diesel dependency.”
Prolectric promoted its wide range of off-grid solar lighting and power products in an exhibition alongside the Conference, including the ProCharge solar battery energy storage system (BESS), a 3-phase solution for clean, quiet and sustainable temporary power. It has 12 integrated solar panels, 120kWh battery capacity and 45kVA inverter power with up to 90kVA generator pass-through capability to support peak site loads.
Generator engine runtime can be reduced by over 80% and the ProCharge is best suited to high-power applications above 20kVA and up to 45kVA. Other products include the ProPower solar hybrid generator, ProVolt portable battery system, ProLight solar lighting tower and electric vehicle charging systems.
Read the blog's earlier report on the CPA Conference here.
● Subscribe free to the blog here to make sure you receive my regular news updates for tool hire and plant hire professionals
