Lower Thames hydrogen
25 February 2026

GeoPura has been announced as the supplier of the largest volume of green hydrogen ever produced for a British construction project, National Highways’ Lower Thames Crossing.
Aiming to be the first major British infrastructure project to be carbon neutral in construction, the plan is to replace the use of diesel fuel with hydrogen, electric and other low-carbon alternatives fuels.
Matt Palmer, Executive Director for the Lower Thames Crossing, said: “By replacing diesel with home-grown hydrogen, we’re not only reducing our own carbon footprint but also helping clean up the construction sector. National Highways is supporting new jobs and skills that will put British businesses and people at the forefront of the growing clean energy sector.”
GeoPura produces green hydrogen across several locations in the UK via electrolysis powered by locally sourced renewable electricity. This includes its flagship HyMarnham Power facility in Nottinghamshire, located on the site of a former coal-fired power station.
The company will supply 2,500 tonnes of hydrogen to the Lower Thames Crossing, said to be enough to replace more than 12 million litres of diesel and to save an estimated 30,000 tonnes of CO2 emissions. The hydrogen will be supplied as a managed service, which includes the delivery, storage and distribution to equipment on site during the main construction phase of the project.
Six hydrogen powered generators provided by GeoPura are already at work on the project, charging batteries used in electric machinery on a work site in Essex with zero emissions.
The Lower Thames Crossing is a new road and tunnel that will tackle congestion on the Dartford Crossing and create a new link between the ports of the south east, the Midlands, and the North.
● Subscribe free to the blog here to make sure you receive my regular news updates for tool hire and plant hire professionals.
