Prolectric charges ahead
5 February 2025

Prolectric will be showcasing its groundbreaking new Solar Battery Energy Storage System (BESS), ProCharge, which the company claims to be unique in the marketplace.
It offers an integrated solar array comprising 12 hydraulically operated 460W panels, which stow neatly away at the top of the unit. The product has been launched following the initial prototype which was tested and adapted in collaboration with some of the UK’s largest contractors.
During the trial at the ‘Kier A417 Missing Link Project’, using the prototype, which has only eight panels, Kier Highways saved over £32,500 in just five months with a projected annual saving of over £69,000. The unit will annually save 150,000kg of CO2e from being emitted into the atmosphere.
Offering three times the output power and 3.5 times the battery capacity of Prolectric’s single-phase system, the 120kWh BESS is designed for high-demand applications requiring up to 45kVA, and integrates seamlessly with diesel generators, commonly 100kVA.
The ProCharge 3-phase model can be used to create a hybrid setup for powering site compounds and to charge machines like electric telehandlers, small EVs, battery-powered all-terrain vehicles, mini diggers and dumpers.
The skid-mounted unit is designed to work with standard UK 3-phase distribution boards and can help operators reduce carbon emissions and cut fuel costs. Noise is also decreased, making it suitable for urban environments and night-time projects in residential areas. Operations can be monitored and controlled remotely via an integrated microcontroller and GPS (global positioning system).
Prolectric (stand J10) says that with the current savings being experienced on live sites, the average unit will be cost-neutral within the first year. Also, of its initial production run, over 80% have already been sold with only limited availability of the remaining units.
● Subscribe to the blog here to receive regular news updates for tool hire and plant hire professionals.
