Groundhog fills the GAP
24 September 2025

GAP Hire Solutions is expanding its welfare unit fleet with Fusion Pulse models from Groundhog, designed for sustainability and efficiency.
The deal was announced today at the PlantWorx equipment exhibition held at Newark Showground and sees Groundhog become GAP’s main welfare unit supplier.
The hirer is focusing on two Groundhog models, namely the single-axle GP360 Fusion Pulse 3.6m unit and the twin-axle GPO660 6.6m unit with twin toilet facilities.
The Fusion Pulse specification includes a roof-mounted solar panel system and an innovative balanced power system which actively monitor battery levels to ensure that the on-board generator is only used when needed.
Generator use is limited to the kettle, microwave and on-board water heating, and Groundhog says this configuration can cut generator use by up to 90%, reducing noise, fuel consumption and servicing costs.
Double inverter sockets with built-in USB-C charging are included, along with a 12V socket for cool boxes or fridges and stainless steel worktops. On-board telematics track usage and report on CO₂e emissions, while an enhanced interior design has been incorporated, based on GAP’s corporate colours.
David Munro, GAP’s Head of Asset Management and Supply Chain, said: “These new welfare units represent a significant step forward for GAP in delivering sustainable and high-quality on-site solutions. The Fusion Pulse system not only reduces emissions and fuel consumption, but also improves comfort and convenience for our customers.”
Paul Ratcliffe, CEO at Groundhog said, “We are extremely excited to start our new partnership with GAP Group. We believe our joint family values align, being quality, sustainability and service, allowing us to form a strong relationship going forward.”
Peter Beach, Sales and Marketing Director at Groundhog added: “We’re proud to partner with GAP Group in supplying innovative, sustainable mobile site welfare units. Groundhog and GAP share the goal of reducing site emissions and driving a more sustainable future.
“Through our training and service support, we’ll ensure seamless delivery of welfare units to sectors across the UK.”
The new Fusion Pulse units will be available across GAP’s network of depots in the coming weeks.
Pictured (above) at PlantWorx are, from left: GAP Managing Director Mark Anderson, Peter Beach, David Munro, Groundhog Director Ryan Ratcliffe and GAP’s Daimon Dunhue, Regional Operations Director – Non-Mech & Welfare Division.
● Subscribe free to the blog here to make sure you receive regular news updates for tool hire and plant hire professionals.



