Battery blues
18 June 2025

There’s an old joke about a teenage rock band rehearsing with all their electric instruments turned up to 11 and causing a power failure. When told they were running far too much equipment off one extension socket, the band’s leader said: “We were told the circuit could take 13 amps, but we’ve only got six plugged in.”
And it seems there are similar stories in the world of hire and battery energy storage solutions, as I discovered when talking recently with Clive Dix, MD of Himoinsa Power Solutions. He believes that many users don’t fully understand the capabilities of such equipment and need to be better trained in its operation, as with any other site machinery.
Clive says this is often shown when monitoring installations via telematics.
“On one occasion a site manager complained that their hybrid power setup worked fine except on Tuesdays, Wednesdays and Thursdays. Investigations showed that on those days a project manager with an electric vehicle visited the site and plugged in his car to recharge during the day. But the system hadn’t been specified for that.
“It’s the same when someone suddenly decides to plug in three electric heaters in welfare units. Perhaps this is why demand is increasing for larger capacity batteries, which we are developing, but users need to be instructed about sensible operation and expectations.”
Clive says that the electronics used in battery energy storage units like those in Himoinsa’s EHR range can identify shortcomings in other components of a hybrid setup such as aged or badly maintained generators. Without a smooth power input, a battery’s controller might behave erratically when it’s not really at fault.
Again, a full and accurate site assessment is needed initially in order to specify the most appropriate solution.
Clive believes that everyone in the supply chain has an important role to play. “As an OEM we supply the training and tools enabling our customer to operate and manage the equipment, but it’s surely the hire company’s responsibility to relay that information to their clients and operatives on a work site.,” he says.
“And to ensure that requires investment in people and resources, and charging the right hire rate.
“As a responsible supplier we are looking to address these industry needs. We are going to expand our operation and we’ve got some exciting plans to announce shortly, so watch this space.”
Photo shows models in Himoinsa’s EHR battery energy storage system range, the latest of which was launched at Bauma, as reported previously on the blog.
● Subscribe free to the blog here to receive regular news updates for tool hire and plant hire professionals.
